Direct works
NPR 20,059,649
Direct works
NPR 20,059,649
Contingency
NPR 1,002,982
Professional fees
NPR 702,088
Grand total
NPR 22,266,210
BMN Build Mart Nepal master estimate
Kathmandu · Kathmandu · 2,400 sq.ft · 2 floors · STANDARD
Preliminary total
NPR 22,266,210NPR 9,278 / sq.ft
| Code | Description | Unit | Qty | Rate | Amount | Source |
|---|---|---|---|---|---|---|
| STR-001 | RCC columns and vertical structural membersFrame | m³ | 13.2 | NPR 23,710 | NPR 312,968 | Kathmandu official-source-linked planning rate |
| STR-002 | RCC beams and bandsFrame | m³ | 14.88 | NPR 23,492 | NPR 349,563 | Kathmandu official-source-linked planning rate |
| STR-003 | RCC floor and roof slabsSlabs | m³ | 25.2 | NPR 23,057 | NPR 581,039 | Kathmandu official-source-linked planning rate |
| STR-004 | High-yield reinforcement steel in superstructureReinforcement | kg | 7,800 | NPR 159 | NPR 1,237,080 | Kathmandu official-source-linked planning rate |
| STR-005 | Formwork to columns, beams and slabsFormwork | m² | 324 | NPR 1,478 | NPR 479,002 | Kathmandu official-source-linked planning rate |
| STR-006 | RCC staircase including landings and formworkStaircase | flight | 1 | NPR 201,206 | NPR 201,206 | Kathmandu official-source-linked planning rate |
| STR-007 | Embedded plates, anchors and miscellaneous structural steelStructural steel | kg | 384 | NPR 252 | NPR 96,703 | Kathmandu official-source-linked planning rate |
| Code | Description | Unit | Qty | Rate | Amount | Source |
|---|---|---|---|---|---|---|
| WAL-001 | External brick/block masonryExternal walls | m² | 252 | NPR 2,556 | NPR 644,077 | Kathmandu official-source-linked planning rate |
| WAL-002 | Internal partition masonryInternal walls | m² | 360 | NPR 2,012 | NPR 724,342 | Kathmandu official-source-linked planning rate |
| WAL-003 | Internal cement-sand plasterInternal plaster | m² | 888 | NPR 627 | NPR 556,954 | Kathmandu official-source-linked planning rate |
| WAL-004 | External weather-resistant plasterExternal plaster | m² | 312 | NPR 750 | NPR 234,137 | Kathmandu official-source-linked planning rate |
| WAL-006 | Cement board backing to wet and service areasWet areas | m² | 33.6 | NPR 2,518 | NPR 84,614 | Kathmandu official-source-linked planning rate |
| Code | Description | Unit | Qty | Rate | Amount | Source |
|---|---|---|---|---|---|---|
| FND-001 | PCC blinding below footingsBlinding | m³ | 7.68 | NPR 15,538 | NPR 119,333 | Kathmandu official-source-linked planning rate |
| FND-002 | RCC isolated/combined/strip footingsFootings | m³ | 15.6 | NPR 22,296 | NPR 347,814 | Kathmandu official-source-linked planning rate |
| FND-003 | High-yield reinforcement steel in foundationsReinforcement | kg | 2,928 | NPR 159 | NPR 464,381 | Kathmandu official-source-linked planning rate |
| FND-004 | Formwork to footing, pedestal and foundation beamsFormwork | m² | 60 | NPR 1,400 | NPR 84,000 | Kathmandu official-source-linked planning rate |
| FND-005 | Stone/brick foundation masonryFoundation wall | m³ | 14.4 | NPR 16,858 | NPR 242,752 | Kathmandu official-source-linked planning rate |
| FND-006 | Damp-proof course with waterproofing additiveDPC | m² | 57.6 | NPR 729 | NPR 41,973 | Kathmandu official-source-linked planning rate |
This is a preliminary planning estimate, not a certified BOQ, official district-rate analysis or contractual quotation. Quantities, rates, taxes, site conditions, structural design and specifications require verification by qualified professionals and current official documents.